Nutrizeal Ltd hot water boiler options
Research and reports
16 December 2009
Nelson based Nutrizeal Ltd have investigated options to replace their LPG hot water boiler with a biomass boiler. Three different options are considered with simple paybacks ranging from 0.7 years to 2.4 years.

